跳转到主内容

跳到步骤#30

Ian Thompson编辑

编辑已通过 由 Carsten Frauenheim

之前
之后
不变

步骤行

[title] Installing Board inside Enclosure
[* yellow] Screw the board onto the standoffs
[* black] Attach the gps and antennae to the velcro on the walls of the enclosure
[* icon_caution] Ensure the board is oriented with the modem on the opposite side of sensor
[* blue] Plug in the terminal block as shown. The silver wire should go to GND, the black data wire should go to P3.2, and the red power wire should go to P3.3
[* orange] Plug in the solar panel
[* green] Plug in the battery
+ [* icon_note] save this step for later if the node isn't immediately going out for testing