跳到步骤#19
由 Brooke Mason — 编辑
编辑已通过 由 Brooke Mason
- 之前
- 之后
- 不变
步骤行
[title] Attach the pipes and sensors | |
[* red] Thread the soil moisture sensor through the hole in the 2-in pipe. | |
- | [* blue] |
+ | [* blue] Thread the pressure transducer wire into the pipe. Make sure the end of the transducer sits at the bottom of the foot valve. |
[* yellow] Attach the 1.5" pipe into the node pipe fitting and tighten the hose clamp at the desired node height. | |
+ | [* icon_note] The sensor wires should be inside the node now! |