跳转到主内容

跳到这一步

Charlotte Pratt编辑

编辑已通过 由 Charlotte Pratt

之前
之后
不变

步骤行

[title] Terminal Block #4 continued
[* red] Screw in the red power wire from the pressure transducer into the second slot(VOUT) as shown
-[* orange] Screw in the brown wire from the soil moisture sensor in the first slot( VOUT-2)
+[* orange] Screw in the brown power wire from the soil moisture sensor in the first slot( VOUT-2)
[* yellow] Screw the other end of the 6-inch black wire into the third slot(GND) as shown