跳转到主内容

跳到这一步

Brooke Mason编辑

编辑已通过 由 Brooke Mason

之前
之后
不变

步骤行

[title] Preparing the 2-inch Pipe for Connection
-[* red] Ask the workshop to make a lengthwise slit on either side of the 2-inch pipe from the end without the pipe bushing to about 1 inch above the 2.5 foot mark(this 1 inch gap is shown in the 2nd image). These slits will make it easier to slide the 1.5 in pipe in and out
+[* red] Ask the machine shop to make a lengthwise slit on either side of the 2-inch pipe from the end without the pipe bushing to about 1 inch above the 2.5 foot mark(this 1 inch gap is shown in the 2nd image). These slits will make it easier to slide the 1.5 in pipe in and out