跳到步骤#3
由 Brooke Mason — 编辑
编辑已通过 由 Brooke Mason
- 之前
- 之后
- 不变
步骤行
[title] Preparing the Pipes for Connection | |
- | [* red] Make a 1 in mark from the other end of the wider pipe |
- | [* orange] Mark holes every 6 inches from this mark(this should yield 6 marks) |
- | [* yellow] Put the pipe fitting onto the thinner pipe(along with an O-ring), and coat the thin pipe with lubricant. |
- | [* green] Put the thin pipe(cut from step 1) into the wide pipe. |
+ | [* red] On the other end of the 1.5-in pipe, mark 1 inch. |
+ | [* orange] Mark holes every 6 inches from this mark 6 total marks) |
+ | [* yellow] Insert the pipe fitting and the O-ring into the 1.5-in pipe |
+ | [* black] Coat the thin pipe with lubricant |
+ | [* green] Insert the 1.5-in pipe into the 2-in pipe |