跳转到主内容

跳到这一步

Charlotte Pratt编辑

编辑已通过 由 Charlotte Pratt

之前
之后
不变

步骤行

[title] Inserting the Foot Valve and Pipe Bushing
-[* red] Obtain the foot valve, removing the internal spring and throwing it away. Trim it by sawing off to the ***???*** section to allow it to fit in the pipe bushing
+[* red] Obtain the foot valve, removing the internal spring and throwing it away. Trim it by sawing off to leave the 1.25 inch and 1.5 inch sections(allowing it to fit in the pipe bushing)
[* orange] Put the foot valve into the pipe bushing, then insert it into the 2 in pipe