[title] Marking the Pipes
-[* orange] Mark the 2 in pipe with lines, making the first one at about 1.75 in from bottom to make space for the pipe bushing. Then, mark out 2.5 ft from the bottom of the attached foot valve for the soil moisture sensor hole. From the 1.75 in line, mark 3 lines 1.5 in apart, then make a 2 in space. Repeat until you reach the 2.5 ft mark
+[* orange] Mark the 2 in pipe with lines, making the first one at about 1.75 in from bottom to make space for the pipe bushing. Then, mark out 2.5 ft from the bottom of the attached foot valve for the soil moisture sensor hole. From the 1.75 in line, mark lines 2 inches apart until you reach the 2.5 ft mark
[* yellow] Obtain the 1.5 in pipe and line up next to the wider pipe from the bottom. Mark a line on the thinner pipe at about 1 in above the 2.5 ft line to mark where the thinner pipe needs to be cut