跳转到主内容
加入维修社区 - 创建账户

Clamp Truck PM Steps

你所需要的

    • Hey, this is Tim, one of your Market Supervisors. I am going to show you guys what we're going to do with the proper tools and everything that we need. Of course, we're going to have PPE, we're going to need our safety glasses, we're going to need our vests, we're going to need some type of gloves.

    • We're going to have our Mighty VAC vacuum pressure system. And then we are also going to need our clamp truck pressure gauge located in your MDOs. They will of course help you find it if you cannot locate it.

    • And then we are also going to have our 3/8 Allen key and a Crescent wrench or a three quarter inch wrench to adjust the clamp pressure.

    • This is an overview of how to Start the WO/SCID.

  1. Clamp Truck PM Steps: 步骤 3 中的图像 1,1
    • Place MDO Clamp Truck Asset Tag and ensure it is accurate on the Serialized WO/SCID

    • This is how you verify GREEN level of Glycol fluid within the bladder and add/subtract to generate the correct pressure.

    • This is how you will verify or adjust Clamp Pressure to 1850 PSI +/- 50 PSI. (1800-1900 PSI)

    • Once verified that the Clamp Pressure is out of alignment, transition to adjusting the Clamp Pressure

    • How to maintain clear clamp rails and Grease as required.

    • This explains the steps to Close the Call.

    • Finalizing WO before submitting Required Photos.

    • Final Step is to Upload Photos for later reference

    • Bladder Gauge (In GREEN), Asset Tag, & Service Sticker

    • INITIAL Clamp Pressure Gauge Reading

    • FINAL Clamp Pressure Gauge Reading (1800-1900 PSI)

终点

另外一个人完成了本指南。

Thomas Jackson

于11/14/22注册

834 声望

创作了2篇指南

0指南评论

添加评论

浏览统计数据:

过去 24 小时: 21

过去 7 天: 61

过去 30 天: 190

总计 190