跳转到主内容
英语
中文

正翻译步骤 3

步骤 3
Now that the bottom is prepped we move onto the top. Here we have more ribbon cables and screws that need to be removed that will end up releasing the top viewing lens area. Some of the ribbon cables reach back around to the motherboard and may need to be removed there.
  • Now that the bottom is prepped we move onto the top.

  • Here we have more ribbon cables and screws that need to be removed that will end up releasing the top viewing lens area.

  • Some of the ribbon cables reach back around to the motherboard and may need to be removed there.

  • Also, there is a wire that runs along the top that just needs to be shifted out of the way.

  • be careful not to break the red or black wire attached to some of the ribbon cables as they will need to be re-soldered if broken.

在此插入翻译

在此插入翻译

在此插入翻译

在此插入翻译

在此插入翻译

在开源创作共享许可协议下,你的投稿已被许可