跳转到主内容
英语
中文

正翻译步骤 5

步骤 5
Water supply from the boiler to the K-cup needle is via a water hose through a check valve. Remove the two small screws that hold the water line to the inlet Unhook the water line from the connector above the K-cup needle. it is a simple press fit.
  • Water supply from the boiler to the K-cup needle is via a water hose through a check valve.

  • Remove the two small screws that hold the water line to the inlet

  • Unhook the water line from the connector above the K-cup needle. it is a simple press fit.

  • Next remove the tie straps. (You don't have to do this step) Just remove the other end of hose from pump. You might have to use a flat head screwdriver to lift up on end of hose while pulling up

从热水组件到K-cup针的供水是通过一个止回阀的水管来供水。

简单的按压来从从K-cup针上方的连接器上取下水管。

接下来移除连接在 K-cup 针上的水管。这是一个简单的压合。

接下来移除困扎带。(但你也不一定需要做这步)只需要移除泵的另一端的困扎带。你在拉起软管末端的时候,可能要用平头螺丝刀去挑起它。

在开源创作共享许可协议下,你的投稿已被许可