Skip to main content

注:你正在编辑的一份前提条件指南。你所做的任何更改将影响包括此步骤的指南

英语
中文

正翻译步骤 3

Step 3
Lift the entire fill valve out of the tank. When installing a new valve, be sure to adjust the float so that the water line  stops one inch below the overflow tube.
  • Lift the entire fill valve out of the tank.

  • When installing a new valve, be sure to adjust the float so that the water line stops one inch below the overflow tube.

在此插入翻译

在此插入翻译

在开源创作共享许可协议下,你的投稿已被许可