跳转到主内容

注:你正在为你刚才查阅的指南编辑前提条件。你所做的任何更改将影响包括此步骤的2本指南

英语
中文

正翻译步骤 6

Step 6
Slide the three lifting spanners down on the riser main, into new lifting positions. Again, make sure he lifting spanners don't touch anything above or below, and that they are evenly spaced about the pipe. Again, make sure he lifting spanners don't touch anything above or below, and that they are evenly spaced about the pipe.
  • Slide the three lifting spanners down on the riser main, into new lifting positions.

  • Again, make sure he lifting spanners don't touch anything above or below, and that they are evenly spaced about the pipe.

在此插入翻译

在此插入翻译

在开源创作共享许可协议下,你的投稿已被许可