注:你正在编辑的一份前提条件指南。你所做的任何更改将影响包括此步骤的2指南。
正翻译步骤 9
步骤 9

-
Tighten the pipe vise, following the same verbal procedure.
-
Repeat the procedure several times:
-
Once everyone is securely holding the pipe, loosen the pipe vise.
-
Lift the pipe.
-
Tighten the pipe vise.
-
Slide the lifting spanners down to a new position.