跳转到主内容

修复你的物品

维修的权力

商店

英语
中文

正翻译步骤 6

步骤 6
The LCD panel is held in place with eight T10 Torx screws. After the screws are free, pivoting the LCD assembly yields the first glimpse of the treasures that lie beneath. Before you can lift up the LCD, carefully disconnect the vertical sync cable from the logic board.
  • The LCD panel is held in place with eight T10 Torx screws.

  • After the screws are free, pivoting the LCD assembly yields the first glimpse of the treasures that lie beneath.

  • Before you can lift up the LCD, carefully disconnect the vertical sync cable from the logic board.

在此插入翻译

在此插入翻译

在此插入翻译

在开源创作共享许可协议下,你的投稿已被许可