跳转到主内容
加入维修社区 - 创建账户

2010-2017 Suzuki Swift Gear Shift Control Cable Bushing Replacement

你所需要的

    1. 2010-2017 Suzuki Swift Gear Shift Control Cable Bushing Replacement, loosen the gear shift lever boot: 步骤 1 中的图像 1,3 2010-2017 Suzuki Swift Gear Shift Control Cable Bushing Replacement, loosen the gear shift lever boot: 步骤 1 中的图像 2,3 2010-2017 Suzuki Swift Gear Shift Control Cable Bushing Replacement, loosen the gear shift lever boot: 步骤 1 中的图像 3,3
      • Grip the backside of the front console box garnish and gently pull it upwards.

      • Pull the garnish from the front console box.

      • Remove the boot pins from the front console box so the boot can move freely.

      询问修复机器人

      添加评论

    2. 2010-2017 Suzuki Swift Gear Shift Control Cable Bushing Replacement, unscrew the front console box: 步骤 2 中的图像 1,3 2010-2017 Suzuki Swift Gear Shift Control Cable Bushing Replacement, unscrew the front console box: 步骤 2 中的图像 2,3 2010-2017 Suzuki Swift Gear Shift Control Cable Bushing Replacement, unscrew the front console box: 步骤 2 中的图像 3,3
      • Pull up the rear console box.

      • While holding up the rear console box, unscrew the 2 rear screws holding on the front console box.

      • Unscrew the 2 front screws holding on the front console box.

      询问修复机器人

      添加评论

    3. 2010-2017 Suzuki Swift Gear Shift Control Cable Bushing Replacement, remove the front console box: 步骤 3 中的图像 1,3 2010-2017 Suzuki Swift Gear Shift Control Cable Bushing Replacement, remove the front console box: 步骤 3 中的图像 2,3 2010-2017 Suzuki Swift Gear Shift Control Cable Bushing Replacement, remove the front console box: 步骤 3 中的图像 3,3
      • Gently pull the corner of the front console box towards you. If the other side did not came off, repeat on the other side.

      • The front console box should be fully detached fron the dashboard, including the locating pins.

      • Pull up the front console box hinging on the rear. You can now remove the entire box by pulling it out over the shifting lever.

      询问修复机器人

      添加评论

    4. 2010-2017 Suzuki Swift Gear Shift Control Cable Bushing Replacement, remove the old bushing: 步骤 4 中的图像 1,3 2010-2017 Suzuki Swift Gear Shift Control Cable Bushing Replacement, remove the old bushing: 步骤 4 中的图像 2,3 2010-2017 Suzuki Swift Gear Shift Control Cable Bushing Replacement, remove the old bushing: 步骤 4 中的图像 3,3
      • The bushing is located on the left side of the gear shift control lever assembly.

      • Pull the cable end from the pin.

      • Remove all bushing remains from the cable end and pin.

      询问修复机器人

      添加评论

    5. 2010-2017 Suzuki Swift Gear Shift Control Cable Bushing Replacement, insert new bushing: 步骤 5 中的图像 1,3 2010-2017 Suzuki Swift Gear Shift Control Cable Bushing Replacement, insert new bushing: 步骤 5 中的图像 2,3 2010-2017 Suzuki Swift Gear Shift Control Cable Bushing Replacement, insert new bushing: 步骤 5 中的图像 3,3
      • Put some grease on the pin and the bushing to ease installation.

      • Push the bushing into the cable end.

      • Push the cable end onto the pin.

      询问修复机器人

      添加评论

结论

To reassemble your device, follow these instructions (from step 3) in reverse order.

取消:我没有完成这个指南。

2等其他人完成本指南。

knipwim

于09/01/18注册

16,360 声望

创作了45篇指南

0指南评论

添加评论

浏览统计数据:

过去 24 小时: 23

过去 7 天: 105

过去 30 天: 540

总计 3,856